Buried garbage subsidence correction | Local subsidence restoration with pressure plate jack-up
Precise investigation of localized subsidence caused by buried debris lurking in gaps! Complete restoration of structural safety through pressure plate jacking and high-viscosity resin injection.
Buried waste, which is a blind spot in ground data, leads to ground weakening due to aging and uneven load, resulting in significant risks such as localized subsidence and sudden cracks and distortions in shallow foundations. This issue, which cannot be captured by SW tests, is quantified by Geotech using hand augers and pinpoint subsurface exploration, objectively and accurately visualizing its location and extent. For repairs, a space-saving jack-up method using pressure slabs is employed. Small hydraulic jacks are synchronously driven with the building's weight as a reaction force, achieving millimeter-level horizontal fine adjustments under constant high-precision laser monitoring. After lifting, high-flow bubble mortar (air milk) is injected into the voids beneath the floor to equalize the ground pressure uniformly. Additionally, high-adhesion epoxy resin is pressure-injected into damaged shallow foundations, restoring the integrity and structural strength of the building to better than when it was newly constructed. Geotech's advanced subsidence correction work establishes lasting structural safety at the foundation level.
- Company:ジオテック
- Price:Other